Work log

Work log: what I did, with dates

A synthesised timeline, not a diary. The first version covers August to November 2026; earlier months are still being sorted.

  1. Eight new records were prepared from one day of work: cheap executors with machine verdicts, a negative result, how to measure memory, and a lesson about a threshold that cannot be won. TMN-008

  2. The Findings library went live with five first records and an open dataset.

  3. migancore.com was opened to search engines.

  4. miganGO was released as open source (MIT licence). TMN-005

  5. Cost logging of miganGO agent runs started; it ran until 9 November. TMN-005

  6. Research on a prompt-injection defence: an 8-layer design and pass limits were written before building.

  7. The public repository of my research method was opened (MIT licence); its measurement-integrity chapter was in the first release. TMN-006

  8. The trap gate passed the limits I locked before measuring on a laptop; the replication on a second, CPU-only computer passed partly. TMN-003

  9. A strict decoding recipe was tested and did not reduce fabrication. TMN-004

  10. The belief that tool training helps honesty was dropped after a five-round test against the base model. TMN-002

  11. A repeat-test tool was built: one test is run many times and judged three ways. Its result overturned my own conclusion about tool training. TMN-001