Work log: what I did, with dates
A synthesised timeline, not a diary. The first version covers August to November 2026; earlier months are still being sorted.
Eight new records were prepared from one day of work: cheap executors with machine verdicts, a negative result, how to measure memory, and a lesson about a threshold that cannot be won. TMN-008
The Findings library went live with five first records and an open dataset.
migancore.com was opened to search engines.
miganGO was released as open source (MIT licence). TMN-005
Cost logging of miganGO agent runs started; it ran until 9 November. TMN-005
Research on a prompt-injection defence: an 8-layer design and pass limits were written before building.
The public repository of my research method was opened (MIT licence); its measurement-integrity chapter was in the first release. TMN-006
The trap gate passed the limits I locked before measuring on a laptop; the replication on a second, CPU-only computer passed partly. TMN-003
A strict decoding recipe was tested and did not reduce fabrication. TMN-004
The belief that tool training helps honesty was dropped after a five-round test against the base model. TMN-002
A repeat-test tool was built: one test is run many times and judged three ways. Its result overturned my own conclusion about tool training. TMN-001